NewPlant under construction
A new beginning, under construction.
Our next-generation plant at Joypur, Amta, Howrah: a 1,71,901 sq ft campus with a German manufacturing line, a 50 m dual-shaft lift test tower, and dedicated space for both elevators and multi-level car parking solutions.
Read the film as text
A new beginning is under construction: our next-generation plant at Joypur, Amta, Howrah, West Bengal, 41 km from our Kolkata head office.
The master plan: a 1,71,901 sq ft campus across four factory blocks as stated on the drawing (workshop 62,556 sq ft, assembly 50,473 sq ft including its first-floor labour quarters, finished goods 41,126 sq ft and powder coating 17,747 sq ft), an 8,884 sq ft administrative building (G+3) and a dual-shaft lift test tower with a 50 m rise.
Our biggest plant yet, built to lead Eastern India’s elevator manufacturing.
Two segments, one campus. Elevators: assembly, powder coating, the test tower and finished goods, for home, office, hospital, goods and car lifts. Parking: the workshop and the LT ParkSmart factory area, for automated stack, puzzle and aisle parking systems.
From design to final QC, under one roof: design, testing, manufacturing and QC, with automated workflow management, a German manufacturing line, and precision with on-time dispatch.